AirAudit Savings Estimator

1. Commercial / plant assumptions

The electricity rate is fully editable. The CO₂ factor should be replaced with the factor used by the client's ESG/carbon accounting methodology if available.

2. Compressor data

Compressor kW FAD Run h/day On-load Off-load Pressure Control Action

3. Demand-side / system information

Important: These are opportunity assumptions, not guaranteed savings. For a formal AirAudit proposal, replace them with measured audit results such as kW, flow, pressure profile, leakage test, compressor control response and production demand.

4. Results

Estimated baseline electricity 1,402,500 kWh/year
Baseline electricity cost PKR 56,100,000 /year
Estimated annual energy saving 427,762 kWh/year
Estimated annual cost saving PKR 17,110,500 /year
Saving potential 30.5% of baseline electricity
CO₂ reduction 192,493 kg CO₂/year
CO₂ reduction 192.5 tonnes/year
Current pressure band 1.5 bar

Calculation rules & methodology

Calculation Formula / rule Purpose
Baseline loaded energy Motor kW × on-load hours/day × operating days/year Estimated compressor energy while loaded.
Baseline unloaded energy Motor kW × off-load hours/day × unloaded-power factor × operating days/year Captures the energy penalty of fixed-speed compressors running unloaded. Default unloaded factor = 25%.
Baseline total Loaded + unloaded energy Estimated annual compressor electricity.
Leakage opportunity Baseline × leakage % × 0.70 Conservative energy-saving conversion; not all leakage can necessarily be eliminated.
Pressure reduction Baseline × pressure-saving factor Uses an approximate 7% energy reduction per 1 bar reduction as a screening rule; final audit should use measured compressor/system data.
Sequencing/control Baseline × control improvement % Captures reduction from better compressor sequencing, avoiding unnecessary running and unloading.
System efficiency Baseline × efficiency improvement % Captures efficiency measures such as compressor optimization, maintenance and operating-point improvements.
Air-use/process Baseline × process optimization % Captures reduction in unnecessary air demand.
Total saving Sum of opportunity savings, capped at 35% of baseline Prevents the screening calculator from producing unrealistic aggregate savings. Formal audit may differ.
Cost saving kWh saved × electricity tariff Annual PKR saving.
CO₂ saving kWh saved × CO₂ factor Annual avoided Scope 2 emissions, subject to the client's chosen emission factor.

The calculator is deliberately a screening model. It is not intended to replace a calibrated power/flow audit. For AirAudit's final savings claim, use measured electrical power, FAD/flow, pressure, operating profile and production data.

Recommended AirAudit audit inputs

Electrical

True kW, kWh, current, voltage, PF, load/unload profile.

Air

FAD/flow, pressure, dew point and demand profile.

Control

Cut-in/cut-out, VFD/FSD, sequencing and standby logic.

Leakage

Leakage survey or off-shift demand test.

Network

Piping size/layout, pressure drops, storage and dryers.

Production

Operating hours, production rate and process air requirements.