Skip to content
+92-322-821-0271
info@airaudit.com.pk
Icon-facebook
Linkedin
X-twitter
Icon-youtube
Home
Services
System Optimization Program
Compressed Air System Design and Drawing
Downstream Equipment Performance Evaluation
Compressor Room Observation
Compressor Efficiency Test
Piping Analysis
Leakage Detection
Flow Monitoring
Compressed Air Applications Analysis
About
FAQ’s
Connect With Us – Social
Industries
Packaging
Denim
FMCG
Engineering
Pharmaceuticals
Steel
Petrochemical
Automotive
Cement
Textile
Media
Gallery
Case Study
Downloads
Videos
Blog
Contact
Hamburger Toggle Menu
+92 3228210271
Questionnaire
Is Your Factory Wasting Money on Compressed Air?
Most plants lose 20–30% of their compressed air — silently, continuously, every shift. Complete this 2-minute checklist and we will send you a free preliminary energy-loss estimate — at no cost or obligation.
A. Your Plant — Basic Details
Company Name
Location
Your Name & job Title
Email Address
Phone Number
Main Industry
Production Area
Plant Operating Pattern
Single shift (1×8 hrs)
Double shift (2×8 hrs)
Three shifts / 24×7 Seasonal / variable
B. Your Compressed Air System
No.s of Air Compressors
Compressor Age (years)
Total Installed Compressor (KW)
Do you have an Air Dryer Installed?
Yes
No
Not Sure
Do you have Air Receivers / Storage Tanks?
Yes
No
Not Sure
Loop or Open-Ended Branches?
Length of Compressed Air Pipework (metres)
Pressure do you Typically run your System at (bar / PSI)?
C. Energy Use and Costs
Monthly Electricity Bill for the Plant (USD or Local Currency)
Do you know what percentage of your Electricity is used by Compressors?
Yes
No
Not Sure
Has your Energy Bill Increased significantly in the last 2 years?
Yes
No
Not Sure
Do you Track or Meter Compressed Air Consumption separately from other Utilities?
Yes
No
Not Sure
Compressed Air Audit Conducted ?
D. Warning Signs — Tick All That Apply
Warning Signs — Tick All That Apply
Compressor runs constantly, even when demand is low
Hissing or whistling sounds from pipes or fittings
Pressure drops at points of use, even after adjustment
Unexpected rise in electricity bills without change in production
Pneumatic tools underperforming or taking longer on tasks
Condensate / water in the air lines or at tools
Compressor room is excessively hot (above 35°C)
Compressors older than 10 years with no efficiency review
Multiple compressors running in parallel with no control logic
No flow meters or system monitoring in place
E. What Matters Most to You Right Now?
Tick your top priorities (up to 3):
Reduce electricity costs immediately
Improve production reliability and uptime
Meet ESG or buyer sustainability requirements
Justify investment in new or upgraded equipment
Get an independent baseline before plant expansion
Respond to management pressure to cut utility costs
F. Anything Else We Should Know?
Anything Else We Should Know?